Completed Project List
Sub-Structure Works – Earthworks3 projects
| No. | Project | Date Start |
|---|---|---|
| 1 | CAD. MEMBINA PERUMAHAN YG MENGANDUNGI 21 UNIT 4 TKT RUMAH TERES JENIS A DAN 25 UNIT 4 TKT RUMAH TERES JENIS B DIATAS LOT 70963 HINGGA 71008, JALAN 3/9, BANDAR BARU SELAYANG, MUKIM BATU, DAERAH GOMBAK, MAJLIS PERBANDARAN SELAYANG, SELAYANG, SELANGOR DARUL EHSAN | Feb-11 |
| 2 | CADANGAN TAMBAHAN & PERUBAHAN SERTA MENAIKTARAF BANGUNAN STADIUM PUTRA SEDIADA DI KOMPLEKS SUKAN NEGARA BUKIT JALIL DI ATAS SEBAHAGIAN LOT PT2875, BUKIT JALIL, MUKIM PETALING, DALAM BANDARAYA KUALA LUMPUR (Demolition Works) | Nov-15 |
| 3 | CADANGAN TAMBAHAN & PERUBAHAN SERTA MENAIKTARAF BANGUNAN STADIUM PUTRA DAN STADIUM AKUATIK SEDIADA DI KOMPLEKS SUKAN NEGARA BUKIT JALIL DI ATAS SEBAHAGIAN LOT PT2875 DAN SEBAHAGIAN LOT 35323, BUKIT JALIL, MUKIM PETALING, DALAM BANDARAYA KUALA LUMPUR (Demolition & Renovation Works) | Oct-16 |
Slope Stabilization & Geotechnical Works9 projects
| No. | Project | Date Start |
|---|---|---|
| 1 | CAD. MEMBINA PERUMAHAN YG MENGANDUNGI 21 UNIT 4 TKT RUMAH TERES JENIS A DAN 25 UNIT 4 TKT RUMAH TERES JENIS B DIATAS LOT 70963 HINGGA 71008, JALAN 3/9, BANDAR BARU SELAYANG, MUKIM BATU, DAERAH GOMBAK, MAJLIS PERBANDARAN SELAYANG, SELANGOR DARUL EHSAN (Slope Stabilization Works) | Feb-2011 |
| 2 | GEOTECHNICAL WORKS, MICROPILE & PILE CAP, RETAINING WALL AND SUBSTRUCTURE FOR CADANGAN MEMBINA PERUMAHAN YANG MENGANDUNGI 21 UNIT 4 TINGKAT RUMAH TERES JENIS A & 25 UNIT 4 TINGKAT RUMAH TERES JENIS B DI ATAS LOT 70963 HINGGA 71008, JALAN 3/9 BANDAR BARU SELAYANG, MUKIM BATU, DAERAH GOMBAK, MAJLIS PERBANDARAN SELAYANG, SELANGOR DARUL EHSAN | Sept-2011 |
| 3 | CADANGAN PEMBINAAN SEMULA CERUN ‘A’ DAN KERJA-KERJA PENYELENGGARAAN DI CERUN ‘B’ DAN CERUN ‘C’ TAMAN SETIAWANGSA, KUALA LUMPUR (2013/A237) | 2016 |
| 4 | REHABILITATION OF TRACK FORMATION, REPLACEMENT OF BALLAST AND ASSOCIATED WORKS BETWEEN JERANTUT, PAHANG TO GUA MUSANG RAILWAY STATION, KELANTAN (PACKAGE B) (Slope Stabilization Works) | Sept-2017 |
| 5 | SECTION C – WORKS DUE TO MAJOR FLOOD BETWEEN GUA MUSANG AND TUMPAT RAILWAY STATION, KELANTAN (Slope Stabilization Works) | Jan-2017 |
| 6 | PROJEK RIVER OF LIFE (FASA 2): 1- PAKEJ 3a – KAW. SG. GOMBAK DARI JLN SULTAN ISMAIL KE KAWASAN TIONG NAM. 2- PAKEJ 3b – KAW. SG. GOMBAK DARI JLN SULTAN ISMAIL KE JALAN PARLIMEN DAN KAW. SUNGAI KLANG DARI MASJID JAMEK KE DANG WANGI (Demolition Works / Construction Works) | 2019 |
| 7 | CADANGAN MENDIRIKAN 1 UNIT RUMAH BANGLO 3 TINGKAT DENGAN 1 TINGKAT BASEMENT DI ATAS LOT 7048, JALAN PAKIS 2, TAMAN FERN GROVE, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. | Oct-2020 |
| 8 | CADANGAN MEMBINA SATU BLOK BANGUNAN INSTITUT 6 TINGKAT DENGAN SATU TINGKAT SEPARA BAWAH TANAH MENGANDUNGI RUANG PEJABAT, RUANG PAMERAN, RUANG REKREASI, RUANG MAJLIS, DEWAN SERBAGUNA DAN RESTORAN DIATAS SEBAHAGIAN LOT 524, SEKSYEN 55, BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN UNTUK TETUAN YMCA KUALA LUMPUR. | Sept-2020 |
| 9 | PROJEK MEMBINA LEBUHRAYA KOTA BHARU PAKEJ 2c & 3a: KOK LANAS KE BUKIT TIU | Sept-2024 |
Demolition Works1 project
| No. | Project | Date Start |
|---|---|---|
| 1 | THE CONSTRUCTION AND COMPLETION OF STRUCTURAL & ARCHITECTURAL WORKS FOR THE PROPOSED ADDITIONS, ALTERATIONS AND UPGRADING OF EXISTING PUTRA STADIUM AND AQUATIC CENTRE AT BUKIT JALIL NATIONAL SPORTS COMPLEX, KUALA LUMPUR (Demolition Works) | Dec-18 |
Design & Build / Resort Construction Works6 projects
| No. | Project | Date Start |
|---|---|---|
| 1 | CIVIL AND STRUCTURE WORK FOR MARANG RESORT & SAFARIS | 1996 |
| 2 | DESIGN AND BUILT GEM BEACH RESORT, BATU RAKIT, KUALA TERENGGANU | 2005 |
| 3 | BUILT HOSBA VALLEY RESORT, JITRA KEDAH | 2007 |
| 4 | DESIGN, BUILT, FURNISHED ZITRO HOTEL PORT DICKSON | 2019 |
| 5 | DESIGN, BUILT, FURNISHED PENTHOUSE MONTKIARA | 2021 |
| 6 | DESIGN, BUILT, FURNISHED JKR OFFICE AT CAMERON HIGHLANDS | 2022 |
TNB Substation Construction Works2 projects
| No. | Project | Date Start |
|---|---|---|
| 1 | PROJECT PENSWASTAAN LEBUHRAYA BERTINGKAT SUNGAI BESI-ULU KELANG (PACKAGE TP2) PLAZA TOLL BUKIT TERATAI (TNB Substation Construction Works) | July 2024 |
| 2 | CADANGAN MEMBINA 1 BLOK BANGUNAN SUB-STATION, 3 TINGKAT BESERTA 1 TINGKAT BESMEN (PENCAWANG PEMBAHAGI UTAMA 3)(PPU3)- 33Kv/11Kv, BAGI PEMBANGUNAN BERCAMPUR TUN RAZAK EXCHANGE (TRX) DIATAS LOT 20118 SEKSYEN 67, JALAN TUN RAZAK / JALAN DAVIS, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK TETUAN TRX CITY SDN BHD. (TNB Substation Construction Works) | July 2024 |
Micropiling Works33 projects
| No. | Project | Date Start |
|---|---|---|
| 1 | CADANGAN TAMBAHAN KEPADA 1 UNIT GUDANG PEJABAT 3 TKT & 1 UNIT SETOR 3 TKT SEDIADA DI ATAS LOT 36, JLN BRP/2B, PUTRA INDUSTRIAL PARK, BKT RAHMAN PUTRA, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR UTK TETUAN ENGTEX S/B | Aug-11 |
| 2 | THE EXECUTION AND COMPLETION OF PACKAGE 1 AND REINFORCED CONCRETE STRUCTURAL WORKS FOR RITZ-CARLTON RESIDENCE TOWER ON LOT 43, 44, 133 & 135, SECTION 58, KUALA LUMPUR (Underpinning Micro piling Works) | Nov-11 |
| 3 | CADANGAN RANGKAIAN PEMBANGUNAN BERCAMPUR DI ATAS LOT 1073, LOT 1075, PT 6004, PT6005 DAN SEBAHAGIAN TANAH KERAJAAN OFF JALAN KUCHING, MUKIM BATU, KUALA LUMPUR. | Nov-11 |
| 4 | CADANGAN PEMBANGUNAN PANGSAPURI PERKHIDMATAN DAN KEDAI PEJABAT 30 TINGKAT DI ATAS LOT 32999 SEKSYEN 1, MUKIM BANDAR CHERAS, DAERAH ULU LANGAT, SELANGOR DAUL EHSAN UNTUK TETUAN CHERAS HONG SOON DEVELOPMENT SDN. BHD. | Nov-12 |
| 5 | CADANGAN MEMBINA 1 UNIT RUMAH BANGLO 2 TINGKAT DENGAN 2 TINGKAT DIBAWAPARAS JALAN DAN SEBUAH KOLAM RENANG DIATAS LOT 65955 (PT 24323), JALAN MOHAGANI H 1, COUNTRY HEIGHT DAMANSARA, MUKIM BATU, WILAYAH PERSEKUTUAN KUALA LUMPUR. | Dec-12 |
| 6 | CADANGAN MENJALANKAN KERJA-KERJA PEMBAIKAN CERUN DAN SISTEM PERPARITAN DI TAMAN BUNGA ANGGERIK / TAMAN BUNGA RAYA, JALAN CENDERAWASIH, KUALA LUMPUR. | Mac-13 |
| 7 | CADANGAN MENJALANKAN KERJA-KERJA PEMBAIKAN CERUN DAN SISTEM PERPARITAN DI JALAN PERDANA, TAMAN RUSA KUALA LUMPUR. | July-13 |
| 8 | EAST RESIDENCE, CLUBHOUSE & FACADE KLGCC – ADDITION AND RENOVATION INCLUSIVE OF FRONT AND BACK FACADE, DEMOLISHING 3 UNITS OF TOWNHOUSE AND CONSTRUCT 1 UNIT CLUBHOUSE FOR 118 UNITS TOWNHOUSE ON LOT PT3565, JALAN 1/70D, OFF JALAN BUKIT KIARA, MUKIM BATU DALAM KUALA LUMPUR. | Aug-13 |
| 9 | CADANGAN PEMBANGUNAN PERUMAHAN FASA 1 YANG MENGADUNGI 58 UNIT RUMAH BANGLO ZERO LOT 3 TINGKAT & 1 UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 23739, 23740 & 23741 SELUAS 35.01 EKAR, JALAN PJU 8/8, DAMANSARA PERDANA, MUKIM SUNGAI BULOH, DAERAH PETALING, SELANGOR DARUL EHSAN | Sept-13 |
| 10 | CADANGAN MEMBINA JAMBATAN SG. GOMBAK DARI JALAN RAJA LAUT / JALAN DANG WANGI KE JALAN KUCHING, KUALA LUMPUR. | Nov-13 |
| 11 | 150mm DIAMETER MICROPILING WORKS AT JALAN IMBI | Dec-13 |
| 12 | PROPOSED FOURTH LANE WIDENING BETWEEN SUNGAI BULOH (KM457) & RAWANG INTERCHANGE (KM443.90) | Dec-13 |
| 13 | PROJECT MASS RAPID TRANSIT LEMBAH KELANG JAJARAN SUNGAI BULOH – KAJANG (Underpinning Micropiling Works) | Aug-13 |
| 14 | CADANGAN PEMBANGUNAN PERUMAHAN FASA 1 YANG MENGANDUNGI 58 UNIT RUMAH BANGLO ZERO LOT 3 TINGKAT, DAN 1 UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 23739, 23740 DAN 23741, PJU 8, DAMANSARA PERDANA, MUKIM SUNGAI BULOH, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN FORESTHILL DAMANSARA LAND SDN. BHD. – MAIN BUILDING WORKS (PHASE 1) | Dec-13 |
| 15 | CAD. TAMBAHAN DAN PENGUBAHSUAIAN PADA LRT STESEN ABDULLAH HUKUM SEDIA ADA DAN CAD. PEMBANGUNAN SEBUAH STESEN KTM KOMUTER 3 TKT DI ATAS SEBAHAGIAN TANAH REZAB KERETAPI DIINTEGRASI DENGAN LRT STESEN ABDULLAH HUKUM SEDIA ADA, JALAN BANGSAR, WILAYAH PERSEKUTUAN | Jan-14 |
| 16 | CADANGAN MEMBINA 2 BLOK PEJABAT 14-17 TINGKAT, 3 BLOK PANGSAPURI SERVIS 25-34 TINGKAT DENGAN 10 TINGKAT PODIUM YANG MENGANDUNGI MEZANIN KEMUDAHAN PANGSAPURI, RUANG PERNIAGAAN (33 UNIT), PEJABAT DAN TEMPAT LETAK KERETA DI ATAS LOT 141 (PT16), JALAN 13/6, SEKSYEN 13, MUKIM BANDAR PETALING JAYA, DAERAH PETALING, SELANGOR DARUL EHSAN (PACIFIC STAR) | Mac-14 |
| 17 | CADANGAN PEMBANGUNAN 1 BLOK KOMPLEKS PERDAGANGAN 3 TINGKAT DENGAN 3 TINGKAT BESMEN YANG MENGADUNGI: 1) 2 TINGKAT RUANG PERDAGANGAN PADA TINGKAT BAWAH DAN TINGKAT 1, 2) 1 TINGKAT PEJABAT PADA TINGKAT DUA, 3) 2 TINGKAT BESMEN TEMPAT LETAK KERETA, DAN 4) 1 TINGKAT BESMEN TEROWONG KESELAMATAN DIATAS LOT PT478, JALAN COCHRANE, SEKSYEN 90, KUALA LUMPUR (Micropiling Works / Soil Nailing / Ground Anchor / Rock Bolt & Guniting) | Mac-14 |
| 18 | ULU JELAI HYDROELECTRIC PROJECT LOT CW2 – PRELIMINARY WORKS PART 1 – POWER INTAKE TOWER | Apr-14 |
| 19 | MEREKABENTUK, MEMBINA DAN MENYIAPKAN BANGUNAN PENCAWANG PEMBAHAGIAN UTAMA (PPU) 33/11 Kv SUBANG JAYA TOWN CENTRE, SELANGOR DARUL EHSAN | May-14 |
| 20 | SUNWAY MEDICAL CENTRE | August-14 |
| 21 | CADANGAN PEMBANGUNAN 1 BLOK DI ATAS LOT 62638 (PARCEL CP4), BANDAR SUNWAY, SUBANG JAYA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN | Oct-14 |
| 22 | MEMBINA JAMBATAN PENEMPATAN ORANG ASLI, KAMPUNG PERWOR, SG SIPUT, PERAK | Jan-15 |
| 23 | CADANGAN MEMBINA SEBUAH BANGLO 3 TINGKAT BERTERES DAN 1 TINGKAT DI BAWAH PARAS JALAN BERSERTA TEMBOK PENAHAN DAN KOLAM RENANG DIATAS LOT 65653 & 65688, MUKIM BATU PERSIARAN TECOMA, DALAM BANDARAYA KUALA LUMPUR | April-15 |
| 24 | SRI NADARAJAR TEMPLE, JELAPANG, IPOH, PERAK DARUL RIDZUAN | August-15 |
| 25 | RANCANGAN TEBATAN BANJIR SUNGAI BUNUS, WILAYAH PERSEKUTUAN KUALA LUMPUR MEMBINA DAN MENYIAPKAN LENCONGAN BANJIR SUNGAI BUNUS SERTA KERJA-KERJA BERKAITAN WILAYAH PERSEKUTUAN, KUALA LUMPUR. | Sept-15 |
| 26 | DEPOT & TPSS – AMPANG LINE EXTENSION PROJECT | Jan-16 |
| 27 | PROPOSED CONFERENCE CENTRE ON PART OF LOT PTD 2491, PTD 2455, MUKIM PANTAI TIMUR DAERAH KOTA TINGGI, JOHOR DARUL TAKZIM | Feb-16 |
| 29 | CADANGAN MEMBINA 1 UNIT RUMAH SESEBUAH 3 TINGKAT NO. 51, DI ATAS LOT 66757, JALAN DESA BUDIMAN, MUKIM BATU, DAERAH KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR | September-16 |
| 30 | UPGRADING THE RAILWAY INFRASTUCTURE AND SYSTEM AT KLANG VALLEY ELECTRIFIED DOUBLE TRACK (KVDT) | February-17 |
| 31 | SETIAWANGSA – PANTAI EXPRESSWAY (SPE) DUKE PHASE III SECTION 1 – KERINCHI TO SALAK (CONSTRUCTION AND COMPLETION OF MICROPILE WORKS FOR VEHICLE BOX CULVERT (MOTORCYCLE UNDERPASS EXTENSION) AT SLIP ROAD JKL/2 (MAINLINE 1)) (Micropiling Works) | June-19 |
| 32 | CADANGAN MEMBINA DAN MENYIAPKAN 16 UNIT KEDAI PEJABAT BERKEMBAR 2 TINGKAT DI ATAS LOT PT23188 (HSM 8128) DAERAH BENTONG, PAHANG DARUL MAKMUR. | Jan-20 |
| 33 | CADANGAN MEMBINA SATU BLOK BAGUNAN INSTITUT 6 TINGKAT DENGAN SATU TINGGKAT SEPARA BAWAH TANAH MENGANDUNGI RUANG PEJABAT, RUANG PAMERAN, RUANG REKREASI, RUANG MAJLIS, DEWAN SEBAGUNA DAN RESTORAN DI ATAS SEBAHAGIAN LOT 524, SEKSYEN 55, BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN UNTUK TETUAN YMCA KUALA LUMPUR | Aug-20 |
| 34 | CADANGAN MEMBINA 1 BLOK BANGUNAN SUB-STATION, 3 TINGKAT BERSERTA 1 TINGKAT BESMEN (PENCAWANG PEMBAHAGIAN UTAMA 3 (PPU3) – 33KV/11KV) BAGI PEMBANGUNAN BERCAMPUR TUN RAZAK EXCHANGE (TRX) DI ATAS LOT 20118 SEKSYEN 67, JALAN TUN RAZAK/JALAN DAVIS, WILAYAH PERSEKUTUAN, KUALA LUMPUR | Aug-24 |
Slope Protection Works39 projects
| No. | Project | Date Start |
|---|---|---|
| 1 | PROPOSED REPAIR WORKS TO EMBANKMENT FAILURE AT SIMPANG PULAI I/C, KM286.6NB SECTION C1. | Dec-08 |
| 2 | CADANGAN PEMBAIKAN CERUN RUNTUH DI SEKSYEN 65, LALUAN FT 185 JLN LOJING-POS BLAU-KUALA BETIS JAJAHAN GUA MUSANG, KELANTAN. | Feb-09 |
| 3 | ACCESS ROAD TO ISTANA BUKIT CENDERING, KUALA TERENGGANU – UNDER STEEL BRIDGE | Mac-09 |
| 4 | PROPOSED STRENGHTENING MEASURES OF DISTRESSED SLOPE AT BUKIT JALIL | April-09 |
| 5 | CADANGAN MEMBINA PERSIMPANGAN JALAN BERTINGKAT DI PERSIMPANGAN JALAN CHERAS / JALAN KELUAR MASUK KE TAMAN LEN SEN KUALA LUMPUR – UNDERPASS 1 (Guniting Works) | May-09 |
| 6 | CADANGAN MEMBINA DAN MENYIAPKAN DUA SETENGAH TINGKAT BANGLO DIATAS LOT NO. 2 JALAN MANIKAM 7/2 SEKSYEN 7, SHAH ALAM, SELANGOR UNTUK TETUAN ILMU JATI SDN BHD | June-09 |
| 7 | KERJA-KERJA KECEMASAN MEMBAIKPULIH CERUN RUNTUH DI KM37.7 & 40.85 (SEK. B) JALAN SEMENYIH-KUALA KLAWANG, DAERAH HULU LANGAT. | Nov-09 |
| 8 | PRIVATISATION OF KUALA LUMPUR – KARAK – KUANTAN EXPRESSWAY. OPERATION AND MAINTENANCE OF KUALA LUMPUR – KARAK – KUANTAN EXPRESSWAY – Proposed To Remove And Backfill Top Soil, Plant Close Turfing And Embankment Shoulder Drain Scattered Location At Temerloh Section. | Mar-10 |
| 9 | PAHANG-SELANGOR RAW WATER TRANSFER PROJECT – WATER TRANSFER TUNNEL | Oct-2010 |
| 10 | CADANGAN PAMBANGUNAN TAMBAHAN MAKTAB PDRM KUALA LUMPUR, CHERAS | Oct-2010 |
| 11 | PRIVATISATION OF KUALA LUMPUR – KARAK HIGHWAY OPERATION AND MAINTENANCE OF KUALA LUMPUR – KARAK HIGHWAY PROPOSED DRAINAGE REMEDIAL WORKS AT KM76.90EB (Drainage) | Feb-2011 |
| 12 | PRIVATISATION OF EAST COAST EXPRESSWAY (PHASE 1) OPERATION AND MAINTENANCE OF EAST COAST EXPRESSWAY (PHASE 1) Proposed Remedial Works At Km 83.50 (WB) (Surface Drainage, Hydroseeding, Close Turfing, Horizontal Drain) | Feb-2011 |
| 13 | PROPOSED REMEDIAL WORKS TO THE ERODED SLOPE SURFACE AND DAMAGED DRAIN AT KM415.85. (WO NO.: C3/080-2011/HOCC/EEKM415.85NB) | Apr-11 |
| 14 | PROPOSED REPAIR WORKS FOR SLOPE FAILURE AT KM388.80 TO KM388.90 SOUTH BOUND, SECTION C2 | Aug-11 |
| 15 | ULU JELAI HYDROELECTRIC PROJECT LOT CW1 & CW2 – PRELIMINARY WORKS PART 1 | July-11 |
| 16 | PROPOSED SLOPE STABILISATION WORKS AT ZONE 4C, BANDAR MAHKOTA CHERAS | Nov-11 |
| 17 | PROPOSED REPAIR WORKS TO EMBANKMENT FAILURES AT KM21, RAMP A (PUTRAJAYA INTERCHANGE) SECTION C6, NORTH SOUTH EXPRESSWAY CENTRAL LINK | Apr-12 |
| 18 | PROPOSED REMEDIAL WORKS TO THE CUT SLOPE FAILURE AT KM427.58, SOUTH BOUND, SECTION C3, NORTH SOUTH EXPRESSWAY | Jul-12 |
| 19 | CONSTRUCTION AND COMPLETION OF SOIL NAIL WALL AT LOT PT30, PEKAN NILAI, DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS | Mar-13 |
| 20 | CADANGAN MENJALANKAN KERJA-KERJA PEMBAIKAN CERUN DAN SISTEM PERPARITAN DI TAMAN BUNGA ANGGERIK / TAMAN BUNGA RAYA, JALAN CENDERAWASIH, KUALA LUMPUR. | Mac-13 |
| 21 | PRIVATISATION OF KUALA LUMPUR – KARAK HIGHWAY OPERATION AND MAINTENANCE OF KUALA LUMPUR – KARAK HIGHWAY AT KM39.70WB | June-13 |
| 22 | CADANGAN MENJALANKAN KERJA-KERJA PEMBAIKAN CERUN DAN SISTEM PERPARITAN DI JALAN PERDANA, TAMAN RUSA KUALA LUMPUR. | July-13 |
| 23 | CADANGAN PEMBANGUNAN PERUMAHAN FASA 1 YANG MENGANDUNGI 58 UNIT RUMAH BANGLO ZERO LOT 3 TINGKAT, DAN 1 UNIT PENCAWANG ELEKTRIK DI ATAS SEBAHAGIAN LOT 23739, 23740 DAN 23741, PJU 8, DAMANSARA PERDANA, MUKIM SUNGAI BULOH, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN FORESTHILL DAMANSARA LAND SDN. BHD. – MAIN BUILDING WORKS (PHASE 1) (Soil Nailing) | Dec-13 |
| 24 | CADANGAN PEMBANGUNAN 1 BLOK KOMPLEKS PERDAGANGAN 3 TINGKAT DENGAN 3 TINGKAT BESMEN YANG MENGADUNGI: 1) 2 TINGKAT RUANG PERDAGANGAN PADA TINGKAT BAWAH DAN TINGKAT 1, 2) 1 TINGKAT PEJABAT PADA TINGKAT DUA, 3) 2 TINGKAT BESMEN TEMPAT LETAK KERETA, DAN 4) 1 TINGKAT BESMEN TEROWONG KESELAMATAN DIATAS LOT PT478, JALAN COCHRANE, SEKSYEN 90, KUALA LUMPUR (Micropiling Works / Soil Nailing / Ground Anchor / Rock Bolt & Guniting) | Mac-14 |
| 25 | CADANGAN MENJALANKAN KERJA-KERJA PEMBAIKAN CERUN DAN SISITEM PERPARITAN DI JALAN 5/38, TAMAN SUPREME KUALA LUMPUR | July-2014 |
| 26 | CADANGAN MENAIKTARAF TEROWONG SEDIADA DI JALAN DUTA KE LEBUHRAYA MAHAMERU, KUALA LUMPUR. (Infra work and Tunneling works) | Nov-14 |
| 27 | CADANGAN MEMBINA SEMULA CERUN A DAN KERJA-KERJA PENYELENGGARAAN DI CERUN B DAN C, TAMAN SETIAWANGSA, KUALA LUMPUR | November-14 |
| 28 | CADANGAN MEMBINA SEBUAH KOMPLEKS PERNIAGAAN 13 TINGKAT YANG MENGANDUNGI 8 TINGKAT RUANG PERNIAGAAN DI ARAS BAWAH HINGGA ARAS 7; DAN 5 TINGKAT TEMPAT LETAK KERETA DI BESMEN 1 DAN 2, ARAS 8 HINGGA 10 DI ATAS LOT PT 5036, SEKSYEN 1, PUSAT BANDAR MELAWATI, BANDAR ULU KELANG, MUKIM SETAPAK, DAERAH GOMBAK, SELANGOR (Guniting Works) | August-15 |
| 29 | MICROPILING AND SLOPE STABILISATION FOR LOT 297, COUNTRY HEIGHT DAMANSARA | August-16 |
| 30 | CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI 38 TKT YANG MENGANDUNGI 288 UNIT KEDIAMAN, 1 TKT SUB-BASEMEN & 7 TKT TEMPAT LETAK KERETA, 1 UNIT PENCAWANG ELEKTRIK, KEMUDAHAN PENDUDUK & KOLAM RENANG DI ATAS LOT 1906, JALAN KIARA 5, MONT KIARA, MUKIM BATU, WILAYAH PERSEKUTUAN KUALA LUMPUR – CK3 MONT KIARA | November-16 |
| 31 | SECTION C – WORKS DUE TO MAJOR FLOOD BETWEEN GUA MUSANG AND TUMPAT RAILWAY STATION, KELANTAN (Slope Protection Works) | Jan-2017 |
| 32 | REHABILITATION OF TRACK FORMATION, REPLACEMENT OF BALLAST AND ASSOCIATED WORKS BETWEEN JERANTUT, PAHANG TO GUA MUSANG RAILWAY STATION, KELANTAN (PACKAGE B) (Slope Protection Works) | Sept-2017 |
| 33 | SETIAWANGSA – PANTAI EXPRESSWAY (SPE) DUKE PHASE III SECTION 1 – KERINCHI TO SALAK (CONSTRUCTION AND COMPLETION OF SOIL NAILING, GUNITING AND HORIZONTAL SUBSOIL DRAIN AT INT1/P47 TO INT1/P49) (Soil Nail & Guniting Works) | February-19 |
| 34 | PROPOSED SLOPE REMEDIAL WORKS AT THE FAILED SLOPE AREA AT SERI PURI APARTMENT, KUALA LUMPUR FOR MANAGEMENT COMMITTEE OF SERI PURI APARTMENT, KUALA LUMPUR (Slope Remedial Works) | August-23 |
| 35 | CONTRACT TNB2222/2023 KERJA-KERJA PEMBAIKAN CERUN RUNTUH (SUBSTATION GROUND STABILIZER) DI PMU YONG PENG NORTH 275/132KV (YGPN), GRID MAINTENANCE SOUTH (SUBZONE KLUANG), GRID DIVISION, TNB. (Slope Remedial Works) | August-23 |
| 36 | DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION, TESTING, COMMISIONING AND MAINTENANCE OF THE ELECTRIFIED DOUBLE TRACK FROM GEMAS TO JOHOR BAHRU (Soil Nail) | June-2023 |
| 37 | KERJA-KERJA REPROFILING WITH SLOPE PROTECTION (TOWER FOUNDATION STABILIZER) UNTUK KAWASAN LOW GCL ANTARA SPAN MENARA T3-T4 132KV ATNI-BTRT, GRID MAINTENANCE (KUALA LUMPUR), GRID DIVISION, TNB. | June-2024 |
| 38 | KERJA-KERJA PEMBAIKAN CERUN RUNTUH (TOWER FOUNDATION STABILIZER), DI T68 JJNG-BMRH, GRID MAINTENANCE (NORTH), GRID DIVISION, TNB (MAINHEAD 1) | Feb-2025 |
| 39 | KERJA-KERJA PEMBAIKAN CERUN SEDIA ADA BERDEKATAN DENGAN MENARA TH (T262) OHL 275kV PAKA-KDIS/KNYR & PAKAHTRG/KNYR/KNYT UNTUK JABATAN GRID DEVELOPMENT, BAHAGIAN GRID, TNB | May-2025 |
Dams, Tunnel, Deep Drilling, Pressure Grouting & Prebore Works11 projects
| No. | Project | Date Start |
|---|---|---|
| 1 | PROPOSED REMEDIAL WORKS TO THE EXISTING RTG – E-BLOCK AT CONTAINER TERMINAL – 1 OF NORTH PORT (Jet Grouting Works) | Jan-2011 |
| 2 | CADANGAN MEMBINA 24 TKT PANGSAPURI SERVIS YANG MENGANDUNGI 306 UNIT KEDIAMAN, 1 TKT KEMUDAHAN PENGHUNI, 5 TKT RUANG NIAGA DAN 2 BESMEN DIATAS LOT 109-115, 435, 443-447 & 471, SEKSYEN 47 DALAM BANDARAYA KUALA LUMPUR. | May-11 |
| 3 | CAD. MEMBINA DAN MENYIAPKAN BALAI BOMBA DAN PENYELAMAT TEMERLOH, DUA (2) PETAK DAN KERJA-KERJA YANG BERKAITAN DENGANNYA DI ATAS LOT 2387 DAN 12067 DAERAH TEMERLOH, PAHANG | Jan-12 |
| 4 | MENGKUANG DAM EXPANSION PROJECT, PULAU-PINANG – CONSTRUCTION FOR DAM AND ASSOCIATED WORKS. (Foundation Treatment Works by Jet Grouting, Consolidation Grouting and Curtain Grouting) | May-12 |
| 5 | PROJEK SKIM BEKALAN AIR TRIANG (SKIM B), JELEBU, NEGERI SEMBILAN. (Package 5: Construction of Sg.Triang Dam and Associated works. Sub-Contract for The Completion of slope Stabilization, Dowel Bar and Grouting Works) | Dec-12 |
| 6 | CADANGAN PEMBANGUNAN DI ATAS PODIUM RUANG PERNIAGAAN – 4 TKT & RUANG LTK KERETA 2 TKT & DI ATAS RUANG LTK KERETA BAWAH TANAH 3 TKT DI ATAS LOT-LOT 5, 16, 29, 30, 42 & 215; TANAH KERAJAAN ATAS LOT-LOT 3345, 39, 237, 160 & 238 & TANAH KERAJAAN YG DIPOHON MILIK DI ATAS SEKSYEN 95A & 98, ANTARA BANDARAYA KUALA LUMPUR & KL ECO CITY SDN. BHD., G. HAJI ABDULLAH HUKUM, JLN BANGSAR, WIL. PERSEKUTUAN UNTUK PROJEK USAHAMA | Dec-12 |
| 7 | THE EXECUTION AND COMPLETION OF PRESSURE CEMENT GROUT CURTAIN TO PROPOSED COMMERCIAL DEVELOPMENT ON LOT 52541, PETALING JAYA, MUKIM DAMANSARA, DAERAH PETALING. (Pressure Grouting Works) | May-13 |
| 8 | SURIAN UNDERPASS – SEMI-D HOUSE | Sept-13 |
| 9 | PREBORE WORKS AT JKR SALAK TINGGI | Nov-13 |
| 10 | PROPOSED HOUSING DEVELOPMENT COMPRISING OF 79 UNITS 2 1/2 STOREY TERRACE HOUSE AND 1 UNIT TNB SUB-STATION ON PART OF LOT 35449 (PT 2063 H.S.D LOT 39084), MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN FOR MESSRS. GLOMAC ALLIANCE SDN BHD. (Grouting Works) | March-14 |
| 11 | DUTA ULU-KELANG EXPRESSWAY (DUKE) – PHASE 2 SECTION 2 TUN RAZAK LINK (Grout Column) | Jan-16 |
Road Works1 project
| No. | Project | Date Start |
|---|---|---|
| 1 | CADANGAN MENAIKTARAF TEROWONG SEDIA ADA DI JALAN DUTA KE LEBUHRAYA MAHAMERU, KUALA LUMPUR (Road Works) | Jan-15 |
Oil & Gas and Engineering Products (Supply and Services)18 projects
| No. | Project | Date Start |
|---|---|---|
| 1 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR X-PRESS HOOGLY VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | October-2019 |
| 2 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR BULL KANGEAN VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | October-2019 |
| 3 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR SHEN HAI VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | October-2020 |
| 4 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR KPV KAPAS VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | October-2020 |
| 5 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR SILVER SUN VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | October-2020 |
| 6 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR TENAGA SATU / FSU LEKAS VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | November-2020 |
| 7 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR INAI KENANGA VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | November-2020 |
| 8 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR NOMADIC HJELLESTAD VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | December-2020 |
| 9 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR SERI CEMARA VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | December-2020 |
| 10 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR SUPER FORTE VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR (Low Strain Pile Integrity Test (PIT)) | January-2020 |
| 11 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR TANJUNG BIRU VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | January-2020 |
| 12 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR MALAYSIA STAR VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | February-2020 |
| 13 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR PENELOPE VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | March-2020 |
| 14 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR SIRROCO VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | March-2020 |
| 15 | TO CARRY OUT OF STRUCTURE – STEEL WORKS AND HULL FITTING FOR SCF MELAMPUS VESSEL; MALAYSIA MARINE & HEAVY ENGINEERING, PASIR GUDANG JOHOR | March-2020 |
| 16 | SUPPLY PRODUCT OF GASKET; OPTIMISTIC ORGANIC SDN.BHD | June-2020 |
| 17 | SUPPLY PRODUCT OF SPW GASKET; OPTIMISTIC ORGANIC SDN BHD, KEMAMAN TERENGGANU. | June-2020 |
| 18 | PROVISION OF MANPOWER, TOOLS AND SUPPLY FOR REPLACEMENT OF MAKE-UP PUMP 3A WITH SAME SPEC. EQUIVALENT INCLUSIVE OF TESTING AND COMISSIONING; MALAKOFF UTILITIES SDN BHD, KUALA LUMPUR | June-2020 |
Slope & Building Works (2023-2025)2 projects
| No. | Project | Date Start |
|---|---|---|
| 1 | PEMBAIKAN CERUN DAN MEMBAIK PULIH JALAN DI LALUAN FT185 SEKSYEN 44.1, JALAN SIMPANG PULAI – BLUE VALLEY DAERAH KINTA, PERAK | Jan-2023 |
| 2 | CADANGAN MEMBINA 1 UNIT RUMAH INAP DUSUN 2 TINGKAT BERSERTA 1 TINGKAT BAWAH TANAH YANG MENGANDUNGI: i) 2 UNIT PAVILION 1 TINGKAT BESERTA POOL DECK, ii) 1 UNIT PENCAWANG ELEKTRIK JENIS PADAT, iii) KOLAM RENANG DAN LAIN-LAIN KEMUDAHAN DI ATAS LOT 12079, MUKIM BULOH TELOR, DAERAH HULU SELANGOR, SELANGOR DARUL EHSAN (Cube Test & Concrete Core Test Works) | August-2025 |
Flood Mitigation Works6 projects
| No. | Project | Date Start |
|---|---|---|
| 1 | PEMBAIKAN CERUN DAN MEMBAIK PULIH JALAN DI LALUAN FT185 SEKSYEN 44.1, JALAN SIMPANG PULAI – BLUE VALLEY DAERAH KINTA, PERAK | Jan-2023 |
| 2 | MAINDHEAD B: SLOPE REHABILITATION WORKS IN THE VICINITY OF PERGAU POWER STATION | October-2023 |
| 3 | SLOPE REHABILITATION WORKS AT KM15 JALAN TERANG, PERGAU POWER STATION | October-2024 |
| 4 | SLOPE REHABILITATION WORKS ALONG ACCESS ROAD TO ULU JELAI DAM (LEFT ABUTMENT OF SUSU DAM) | January-2026 |
| 5 | RANCANGAN TEBATAN BANJIR LEMBANGAN SUNGAI MUAR FASA 3 PAKEJ 1 DI DAERAH SEGAMAT, JOHOR – MENAIKTARAF SUNGAI MUAR DI ANTARA PERTEMUAN SUNGAI JEMENTAH SEHINGGA PERTEMUAN SUNGAI LABIS SERTA KERJA-KERJA BERKAITAN (Construction of Bund and other Associated Works at Sungai Muar (CH145,000-146,200) (Section A)) | May-2025 |
| 6 | CONSTRUCTION OF DREDGING, WIDENING WORKS AND INCLUDING OTHER ASSOCIATED WORKS AT SUNGAI SIMPANG KIRI (PACKAGE 6) FOR RANCANGAN TEBATAN BANJIR BANDAR BATU PAHAT, JOHOR | Oct-2025 |
Soil Investigation Works180 projects
| No. | Project | Date Start |
|---|---|---|
| 1 | PROPOSED REFINEY AND PETROCHEMICAL INTEGRATED DEVELOPMENT (RAPID) FOR PETRONAS, JOHOR DARUL TAKZIM (PACKAGE 2) | Nov-11 |
| 2 | PROPOSED YEE HUP VISITOR’S CENTRE IPOH PERAK | Nov-11 |
| 3 | PROPOSED ANTENNA LOCATION FOR U MOBILE AT KG. TOK MUDA KAPAR SELANGOR. | Nov-11 |
| 4 | SI WORKS FOR RESIDENCE 8 JALAN KLANG LAMA | Nov-11 |
| 5 | CAD. PEMBANGUNAN 1 BLOK KONDOMINIUM 102 UNIT TINGKAT JALAN YAP KWAN SENG KUALA LUMPUR | Dec-11 |
| 6 | PROPOSED PRESSURE IMPROVEMENT WORKS OF WATER STRESS AREAS IN KLANG PETALING AND SEPANG DISTRICTS | Dec-11 |
| 7 | PROPOSED BERTAM DAF PHASE 2 WATER TREATMENT PLANT, DURIAN TUNGGAL, MELAKA. | Jan-12 |
| 8 | PROPOSED SOIL INVESTIGATION & INSTRUMENTATION WORKS – PACKAGE 1 (KUALA LUMPUR INTERNATIONAL FINANCIAL DISTRICT (“KLIFD) | Jan-12 |
| 9 | SI WORKS FOR PROJEK MASS RAPID TRANSIT LEMBAH KELANG: JAJARAN SUNGAI BULOH-KAJANG PACKAGE G1 (SUNGAI BULOH TO JALAN IPOH & VELODROME TO KAJANG) | Mar-12 |
| 10 | SI WORKS AT ICON CITY, PETALING JAYA | Mar-12 |
| 11 | CAD.PEMBANGUNAN 1 BLOK PANGSAPURI SERVIS 20 TINGKAT (150 UNIT) PROMEN RESIDENCES DI ATAS LOT 83, SEKSYEN 88, JALAN DAMAI OFF JALAN AMPANG, BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN (CAVITY GROUTING) | May-12 |
| 12 | CADANGAN PEMBANGUNAN 10 UNIT PANGSAPURI MEWAH 5 TINGKAT BERSERTA 2 TINGKAT BESMEN TEMPAT LETAK KERETA DI ATAS LOT 135, SEKSYEN 88A, MUKIM BANDAR KUALA LUMPUR, W.P KUALA LUMPUR. | May-12 |
| 13 | SI WORKS (PACKAGE A) FOR THE KELANA JAYA (KLJ) LINE EXTENSION PROJECT (PROOF CORING) AT PILE CAP LOCATION | June-12 |
| 14 | RAMP ACCESSES OVER FEDERAL HIGHWAY AND UPGRADING OF FEDERAL HIGHWAY (PACKAGE 1) | June-12 |
| 15 | SI WORKS FOR PMU BAKAR BAGINDA AND PMU BANGI HEIGHT | June-12 |
| 16 | PROPOSED PRESSURE IMPROVEMENT OF LOW PRESSURE AREAS PETALING DISTRICTS | July-12 |
| 17 | LANTIKAN UNTUK MENJALANKAN KERJA-KERJA PENYIASATAN TAPAK BAGI PROJEK KOMPLEKS ISLAM & DEWAN SERBAGUNA, KUALA LANGAT, SELANGOR DARUL EHSAN | July-12 |
| 18 | SI WORKS FOR CW PUMP HOUSE FOR DESIGN, ENGINEERING, PROCUREMENT, DELIVERY, CONSTRUCTION AND COMMISSIONING OF THE MANJUNG COAL FIRED POWER PLANT AT MANJUNG IN MALAYSIA | July-12 |
| 19 | SI WORKS FOR 5000 TONNE/DAY INTEGRATED CEMENT PLANT AT BUKIT SAGU, KUANTAN, PAHANG DARUL MAKMUR, MALAYSIA | Aug-12 |
| 20 | SI WORKS FOR MACKINTOSH PROBE AT PETRONAS SEKSYEN 15, FEDERAL HIGHWAY | Aug-12 |
| 21 | SI WORKS FOR MACKINTOSH PROBE AT PETRONAS KESAS ARAH BARAT | Aug-12 |
| 22 | PROPOSED COMMERCIAL DEVELOPMENT CONSISTING OF 1 BLOCK OF 32-STOREY OFFICE TOWER, PODIUM PARKING AND 4 BASEMENT LEVELS ON LOTS 534 AND 535 JALAN BUKIT BINTANG, KUALA LUMPUR | Aug-12 |
| 23 | SI WORKS FOR REDEVELOPMENT OF PANTAI HOSPITAL KLANG, (PHK). | Sept-12 |
| 24 | SI WORKS FOR CADANGAN PEMBANGUNAN PERUMAHAN BERCAMPUR DAN PERNIAGAAN DI ATAS LOT 121,122,434,435,436 PT 3671 TELUK MERBAU, MUKIM SEPANG DAERAH SEPANG, SELANGOR | Sept-12 |
| 25 | SI WORKS AT PETRONAS 1ST PLUS EXIT KUALA LUMPUR | Sept-12 |
| 26 | MENAIKTARAF JALAN FT92 DARI BANDAR PENAWAR (SENAI DESARU EXPRESSWAY) KE SUNGAI RENGIT (SEK D-28) DARI 2 LORONG KEPADA 4 LORONG KOTA TINGGI, JOHOR. | Jan-13 |
| 27 | TANAH HARTA NO.1095, LOT 11709, PERSATUAN PENGURUSAN KUIL SRI MAHA MARIAMMAN KUNDANG RAWANG, SELANGOR. | Jan-13 |
| 28 | PAKEJ B30 KERJA-KERJA MENAIKTARAF 1 LOJI RAWATAN KUMBAHAN (KLR147) KEPADA KATEGORI 1 DI KAWASAN KUALA LUMPUR REKA & BINA. | Jan-13 |
| 29 | CADANGAN MEMBINA SEBUAH HOSPITAL SWASTA 2 TINGKAT DENGAN 1 ARAS BAWAH TANAH DI LOT 69091 JALAN MERU MUKIM KAPAR. | Feb-13 |
| 30 | SI WORKS FOR KVMRT PROJECT JAJARAN SG.BULOH-KAJANG (KAJANG). | Feb-13 |
| 31 | SI WORKS FOR EMPANGAN KAHANG AT KUANG JOHOR. | Feb-13 |
| 32 | SI WORKS FOR BUNGALOW LOT AT COUNTRY HEIGHT THE MINES. | Feb-13 |
| 33 | PROPOSED FOR SI WORKS AT SG.LABU & SG.LANGAT DISTRICT OF SEPANG. | Feb-13 |
| 34 | CONSTRUCTION AND COMPLETION OF FACILITIES WORKS FOR KLJ. | Feb-13 |
| 35 | SI WORKS FOR ECO CITY KAMPUNG HAJI ABDULLAH HUKUM MID VALLEY. | Mar-13 |
| 36 | SI WORKS ECO CITY | Mar-13 |
| 37 | MEMBINA BARU BALAI RAYA KUALA TERLA, CAMERON HIGHLAND, PAHANG DARUL MAKMUR. | Mar-13 |
| 38 | SI WORKS FOR SPRITZOR RESOURCES JALAN CHANGKAT RAJA CHULAN. | Mar-13 |
| 39 | CADANGAN PEMBANGUNAN KEDIAMAN YANG MENGANDUNGI DI ATAS LOT 1898, JALAN KIARA 3, BUKIT KIARA. | Mar-13 |
| 40 | PROJECT MENGGANTIKAN JAMBATAN SEDIA ADA DI FT 005/328/50, PORT DICKSON, NEGERI SEMBILAN. | Mar-13 |
| 41 | SI WORKS AT LOT 77, JALAN JURUNILAI U1/20 HICOM GLENMARIE SHAH ALAM. | Apr-13 |
| 42 | SI WORKS AT LOT 997, SEKSYEN 62 SHAW PLAZA KUALA LUMPUR. | Apr-13 |
| 43 | SI WORKS AT NEW PMU SEAPARK, PETALING JAYA. | Apr-13 |
| 44 | THE PROPOSED UPGRADING OF PUBLIC FACILITIES AT SUNGAI PETANI TOLL PLAZA (UTARA) | Apr-13 |
| 45 | SI WORKS AT NEW PMU, SEAPARK, PETALING JAYA | May-13 |
| 46 | SI WORKS FOR NEGERI SEMBILAN CIMA INDUSTRY (NSCI) AT BAHAU (ADDITIONAL) | May-13 |
| 47 | PROPOSED 82 UNIT 3-STOREY DECTACHED CORPORATE FACTORIES AT ALAM @ PERDANA INDUSTRIAL PERDANA | May-13 |
| 48 | SI WORKS AT CYBERJAYA | June-13 |
| 49 | THE CONSTRUCTION AND COMPLETION OF FACILITIES WORKS (PACKAGE A) FOR KELANA JAYA (ADDITIONAL) | June-13 |
| 50 | MP WORKS AT KG MELAYU KEPONG, KL | June-13 |
| 51 | SOIL INVESTIGATION WORKS AT PMU TASEK CEMENT GIS, PERAK | June-13 |
| 52 | SI WORKS AT DESA HEIGHT VILLA, DESA PETALING. | July-13 |
| 53 | SI WORKS AT MALURI STATION & CROSSOVER | July-13 |
| 54 | MP WORKS AT BUKIT BENDERA, PENANG. | July-13 |
| 55 | SI WORKS FOR BATU UBAN PARCEL 2A, PENANG | July-13 |
| 56 | SI WORKS FOR PROPOSED DEVELOPMENT ON LOT 6043 MUKIM OF LABU, DISTRICT. | Aug-13 |
| 57 | SI WORKS FOR LANGAT SEWERAGE WORKS SELANGOR (NETWORK AREA). | Aug-13 |
| 58 | SI WORKS FOR PROPOSED BELFIELD MIXED DEVELOPMENT AT LOT 1220, SEKSYEN 69, KUALA LUMPUR. | Aug-13 |
| 59 | SI WORKS FOR CADANGAN MEMBINA PAIP PEMBETUNGAN BAGI KAWASAN SI RUSA. | Aug-13 |
| 60 | MP WORKS AT KEDAH & PENANG. | Aug-13 |
| 61 | MP WORKS AT DENGKIL, SELANGOR DARUL EHSAN. | Sept-13 |
| 62 | SI WORKS AT SUNGAI BULOH (RRIM) | Sept-13 |
| 63 | SI WORKS AT LENGGONG, PERAK DARUL RIDZUAN | Oct-13 |
| 64 | SI WORKS AT CYBERJAYA (ADDITIONAL) | Oct-13 |
| 65 | SI WORKS AT JALAN TUN ISMAIL | Nov-13 |
| 66 | CAD. MEMBINA JABATAN SG. GOMBAK DARI JALAN RAJA LAUT / JALAN DANG WANGI KE JALAN KUCHING, K.L | Nov-13 |
| 67 | SI WORKS AT JALAN PJU 8/8, DAMANSARA PERDANA | Nov-13 |
| 68 | SI WORKS AT ALAM JAYA | Dec-13 |
| 69 | PROPOSED 392 UNITS SERVICE APARTMENT AT TAMAN SUTERA (PHASE 7) MUKIM KAJANG SELANGOR | Dec-13 |
| 70 | CADANGAN PEMBINAAN BANGUNAN TAPAK BARU SEKOLAH JENIS KEBANGSAAN TAMIL (SJKT) LADANG LANCHANG, PERAK | Dec-13 |
| 71 | PROJEK MRT LEMBAH KELANG JAJARAN SG.BULOH KAJANG (PACKAGE V2) ADDITIONAL | Dec-13 |
| 72 | SI WORKS FOR MRT PROJECT AT TAMAN MALURI STATION (ADDITIONAL) | Jan-14 |
| 73 | MEMBINA JALAN BARU DARI SUNGKAI LALUAN AISA KE KUALA BIKAM LALUAN FT058 DAERAH BATANG PADANG PERAK. | Jan-14 |
| 74 | MP WORKS AT MUTIARA BEACH RESORT, BATU MAUNG PENANG | Jan-14 |
| 75 | SI WORKS FOR PROJEK MENGGANTIKAN JAMBATAN STURUKUR NO. FT006/056/058 DI LALUAN PERSEKUTUAN (NEGERI PULAU PINANG) DAERAH TIMUR LAUT P.PINANG | Jan-14 |
| 76 | CAD. SKIM PERUMAHAN DIATAS PT 14087, MUKIM LUMUT DAERAH MANJUNG, PERAK DARUL RIDZUAN | Feb-14 |
| 77 | SI WORKS AT SENDAYAN, NEAR SEREMBAN NEGERI SEMBILAN | Feb-14 |
| 78 | SI WORKS AT SOUTH PORTAL CHERAS | Feb-14 |
| 79 | SI WORKS AT PT 1854, MUKIM 12 KAMPUNG SELAMAT SEBERANG PERAI UTARA, PULAU PINANG. | Mar-14 |
| 80 | SI WORKS FOR THE CONSTRUCTION AND COMPLETION OF PROPOSED AMPANG-KUALA LUMPUR ELEVATED HIGHWAY (AKLEH) PHASE 2 EAST BOUND FROM JALAN JELATEK INTERCHANGE (KM4.6) TO ULU KELANG INTERCHANGE (KM6.0) FOR PROJECT LINTASAN KOTA SDN BHD. | Mar-14 |
| 81 | MACKINTOSH PROBES WORKS AT TNB BRICKFIELD, KUALA LUMPUR | Mar-14 |
| 82 | SI WORKS AT PPU SUBANG JAYA TOWN CENTRE | Apr-14 |
| 83 | SI WORKS AT BANDAR UTAMA, DAMANSARA, SELANGOR | Apr-14 |
| 84 | SOIL INVESTIGATION WORKS FOR THE PROPOSED CONSTRUCTION AND COMPLETION OF CYBERJAYA MOSQUE, PERSIARAN SEMARAK API, CYBER 1, CYBERJAYA, SELANGOR DARUL EHSAN. | June-14 |
| 85 | SOIL INVESATIGATION WORKS AT LOT 1485, MUKIM 12 BAYAN LEPAS 4100A JALAN BATU MAUNG, PULAU PINANG | June-14 |
| 86 | MP WORKS FOR KVMRT: STATION KG BARU SG BULOH | June-14 |
| 87 | SOIL INVESTIGATION FOR SKLIA | June-14 |
| 88 | SI WORKS FOR FELDA LBJ BANDAR ENSTEK NILAI, NEGERI SEMBILAN | July-14 |
| 89 | CAD. MEMBINA DAN MENYIAPKAN 7 UNIT RUMAH SESEBUAH DIATAS LOT 2973, KAMPUNG SUNGAI PENCHALA WILAYAH PERSEKUTUAN | July-14 |
| 90 | SI WORKS NOMIATED SUB-CONTRACT FOR THE CONSTRUCTION, COMPLETION, TESTING AND COMMISSIONNING OF DEPOT AND TPSS KG.KUALA SG.BARU INCLUDING CIVIL WORKS, EXTERNAL WORKS AND ALL ASSOCIATED WORKS (PACKAGE B) AMPANG LINE. | July-14 |
| 91 | PERMOHONAN KEBENARAN MERANCANG PELAN SUSUNATUR BAGI TUJUAN SERAH BALIK DAN PEMBERMILIKAN SEMULA TANAH DI BAWAH SEKSYEN 204B KANUN TANAH NEGARA DARIPADA PERTANIAN KEPADA BERANANG, DAERAH HULU LANGAT SELANGOR DARUL EHSAN. | Aug-14 |
| 92 | THE PROPOSED SMALL & MEDIUM ENTERPRISE MARKETING AND EXHIBITION CENTRE (SME), TANJUNG LUMPUR, KUANTAN PAHANG DARUL MAKMUR FOR THE EAST COAST ECONOMIC REGION DEVELOPMENT COUNCIL (ECERDC) | Aug-14 |
| 93 | SOIL WORKS AT JALAN AMPANG | Aug-14 |
| 94 | SI WORKS FOR PROPOSED DEVELOPMENT FOR SERVICE APARTMENT AT MICASA, JALAN TUN RAZAK, KUALA LUMPUR. | Sept-14 |
| 95 | SOIL INVESTIGATION WORKS AT ECO CITY, KUALA LUMPUR. | Sept-14 |
| 96 | SOIL INVESTIGATION WORKS FOR “CADANGAN MENDIRIKAN BANGLO DUA TINGKAT SETENGAH DIATAS LOT PT 3470 PUNCAK KIARA MUKIM DAMANSARA KUALA LUMPUR, WILAYAH PERSEKUTUAN | Oct-14 |
| 97 | CAD. MEMBINA SKIM PERUMAHAN DIATAS LOT 2572, YANG MENGADUNGI 10 UNIT RUMAH TERES 1 TINGKAT, 22 UNIT RUMAH BERKEMBAR 2 TINGKAT PEKAN DENGKIL, MUKIM DENGKIL SEPANG | Oct-14 |
| 98 | PROPOSED 208 UNITS OF PRIMA DEVELOPMENT ON PTP LAND IN SLIM RIVER, PERAK DARUL RIDZUAN | Oct-14 |
| 99 | PROJECT MRT LEMBAH KELANG JAJARAN SUNGAI BULOH KAJANG PACKAGE V2 CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND OTHER ASSOCIATED WORKS FROM KOTA DAMANSARA STATION TO DATARAN SUNWAY STATION | Oct-14 |
| 100 | SI WORKS FOR “PERMOHONAN KEBENARAN MERANCANG UNTUK PECAH SEMPADAN BAGI PEMBANGUNAN DI ATAS LOT 378 (30 EKAR) & LOT 1611 (0.75 EKAR), JALAN HULU KELANG, MUKIM HULU KELANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN”. | Oct-14 |
| 101 | SI WORKS AT JANDA BAIK, MUKIM BENTONG, PAHANG | Oct-14 |
| 102 | SI WORKS FOR SENTUL RAYA REDEVELOPMENT SENTUL KUALA LUMPUR. | Nov-14 |
| 103 | SI WORKS AT (4740 A) G8 2878 LOT 1280, LUBUK BUAYA PADANG MAT SIRAT 0700 LANGKAWI, KEDAH | Nov-14 |
| 104 | SI WORKS AT (4738 A) LOT 112 KG. PADANG MAT SIRAT JALAN LAPANGAN TERBANG PADANG MAT SIRAT 07100 LANGKAWI, KEDAH | Nov-14 |
| 105 | SI WORKS AT (4163 C) GM 381, LOT 1617 KG KELUBI KMK AYER HANGAT 0700 LANGKAWI | Nov-14 |
| 106 | SI WORKS AT (4743 A) PT 657 KG. BUKIT TANGGA KAMPUNG ULU MELAKA 0700 LANGKAWI | Nov-14 |
| 107 | MP WORKS FOR CADANGAN MENAIKTARAF TEROWONG SEDIADA DI JALAN DUTA KE LEBUHRAYA MAHAMERU, KUALA LUMPUR. | Jan-15 |
| 108 | MP WORKS FOR CADANGAN KOMPLEKS PEJABAT JABATAN KEJURUTERAAN MEKANIKAL, SEKTOR SITAAN JABATAN PENGUATKUASAAN, SEKTOR PUSAT VEKTOR DAN PUSAT KURUNGAN HAIWAN, SQUAD KECEMASAN DAN FLYING SQUAD JABATAN KESIHATAN DAN ALAM SEKITAR DIATAS PT 26210 DAN 26211 DI JALAN LINGKARAN TENGAH 2 (MRR2), MUKIM BATU, KUALA LUMPUR. | Jan-15 |
| 109 | SOIL INVESTIGATION WORKS FOR “CADANGAN MEMBINA 40 UNIT RUMAH YANG MENGANDUNGI 22 UNIT RUMAH TERES 2 TINGKAT, 10 UNIT RUMAH TERES 1 TINGKAT, 8 UNIT RUMAH BERKEMBAR 1 TINGKAT BESERTA 1 UNIT LOJI KUMBAHAN (STP) MEKANIKAL NO.45, JALAN TANJUNG SAUH 30/226 & 1 UNIT PENCAWANG ELEKTRIK PADAT NO.2 JALAN TANJUNG SAUH 30/108, DIATAS LOT 3312, JALAN TANJUNG SAUH (LORONG HAJI ABU BAKAR), SEKSYEN 30, 40460 SHAH ALAM, SELANGOR DARUL EHSAN”. | Mar-15 |
| 110 | SOIL INVESTIGATION WORKS AT JALAN YAP KWAN SENG, KUALA LUMPUR. | May-15 |
| 111 | SOIL INVESTIGATION WORKS AT GEOPANCAR (BALAKONG STORE-NEW LAND), BALAKONG SELANGOR DARUL EHSAN. | May-15 |
| 112 | SOIL INVESTIGATION PROPOSED TO CENTRAL PLAZA I-CITY REAL ESTATE SDN BHD IN SHAH ALAM, MALAYSIA. | June-15 |
| 113 | SOIL INVESTIGATION WORKS AT 1X1000MW MANJONG COAL FIELD POWER PLANT-SUPPLY AND INSTALL STANDPIPE PIEZOMETER AT NEW 5 YEARS ASH POND, SRI MANJUNG, PERAK. | June-15 |
| 114 | SOIL INVESTIGATION WORKS FOR SG.GOMBAK BRIDGE, JALAN KUCHING, KUALA LUMPUR. | June-15 |
| 115 | SOIL INVESTIGATION WORKS AT MAJU STATION HOTEL, BANDAR TASIK SELATAN, SG BESI, KUALA LUMPUR (CAVITY TREATMENT WORKS). | June-15 |
| 116 | SOIL INVESTIGATION WORKS FOR NOMIATED SUB-CONSTRACT FOR THE CONSTRUCTION AND COMPLETION, TESTING AND COMMISIONING OF DEPOT AND TPSS KG KUALA SG BARU (PACKAGE B) AMPANG LINE. | Apr-16 |
| 117 | SOIL INVESTIGATION WORKS FOR CONSTRUCTION AND COMPLETION OF THE DIAPHRAGM WALLS AND ASSOCIATED WORKS (PACKAGE 1) FOR THE PROPOSED PHASE 3B KOMPLEKS DAYABUMI NEW TOWER DEVELOPMENT. | Apr-16 |
| 118 | SOIL INVESTIGATION WORKS FOR RUMAH IBADAT DEWAN KERAMAIAN TAMAN KINRARA, PUCHONG JAYA, UNTUK TETUAN PERSATUAN PENGANUT SRI MAHA KARUMARIAMMAN ALAYAM. | Apr-16 |
| 119 | SOIL INVESTIGATION WORKS AT JALAN YAP KWAN SENG, KUALA LUMPUR. | May-16 |
| 120 | SOIL INVESTIGATION WORKS AT BATANG BERJUNTAI, KUALA LUMPUR. | May-16 |
| 121 | SOIL INVESTIGATION WORKS FOR CADANGAN 1 BLOK BANGUNAN SEKOLAH DI SEKOLAH MENENGAH RENDAH AGAMA CHUAH, PORT DICKSON | May-16 |
| 122 | SOIL INVESTIGATION WORKS AT CYBERJAYA | May-16 |
| 123 | SOIL INVESTIAGATION WORKS FOR CADANGAN PEMBINAAN LANGAT CENTRALISED SEWAGE TREATMENT PLANT DAN PENYAMBUNGAN PAIP PEMBENTUNGAN DI KAWASAN TADAHAN LEMBANGAN SUNGAI LANGAT SECARA REKA DAN BINA (ADDITIONAL BOREHOLES) | Jul-16 |
| 124 | SOIL INVESTIGATION WORKS FOR PROJEK BINA DAN PASANG KOLAM AIR MENARA DAN PAIP UTAMA DI KG SUNGAI SAMAK DAN KAJIAN KEMUNGKINAN DIKAWASAN BAGAN DATOH, HILIR PERAK. | Jul-16 |
| 125 | PROPOSED SUBSURFACE INVESTIGATION (SI) WORKS AT KM 53.75 WESTBOUND, KUALA LUMPUR-KARAK HIGHWAY | Jul-16 |
| 126 | SOIL INVESTIGATION WORKS FOR CADANGAN PEMINDAHAN AIR MENTAH DARI SKIM PAMER KE EMPANGAN, KOTA TINGGI, JOHOR. | Jul-16 |
| 127 | SOIL INVESTIGATION WORKS FOR PEMBINAAN LANGAT RANGKAIAN PAIP PEMBENTUNGAN DAN RASIONALISASI LOJI RAWATAN KUMBAHAN DIBATU, JINJANG-KEPONG, KUALA LUMPUR. | Aug-16 |
| 128 | SOIL INVESTIGATION WORKS FOR CASA KIARA 3, AT JALAN KIARA 5, MONT KIARA, KUALA LUMPUR. | Aug-16 |
| 129 | SOIL INVESTIGATION WORKS FOR DIATAS LOT PT 391 & PT 392 SEKSYEN 90, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK SUNWAY INTEGRATED PROPERTIES SDN BHD. (VELOCITY) | Aug-16 |
| 130 | SOIL INVESTIGATION WORKS FOR MAJU, KUALA LUMPUR | Sept-16 |
| 131 | SOIL INVESTIGATION WORKS FOR PROJECT MSPRI: CONSTRUCTION AND COMPLETION OF MULTI STOREY CAR PARK BUILDING, EXTERNAL WORKS AND OTHER ASSOCIATED WORKS AT SG BULOH STATION (ADDITIONAL 2014) | Sept-16 |
| 132 | SOIL INVESTIGATION WORKS FOR 1 BLOK PANGSAPURI 49 TINGKAT, PERSIARAN STONOR, KUALA LUMPUR. | Oct-16 |
| 133 | SOIL INVESTIGATION WORKS FOR ASU JOHOR, MALAYSIA | Oct-16 |
| 134 | SOIL INVESTIGATION WORKS FOR PROJEK KECEMASAN PENYALURAN AIR MENTAH DARIPADA SG. LENGGOK KE EMPANGAN CONGOK, MERSING, JOHOR. | Oct-16 |
| 135 | SOIL INVESTIGATION WORKS FOR “CADANGAN PEMBANGUNAN YANG MENGANDUNGI: (I) 23 UNIT RUMAH TERES 1 TINGKAT (II) 14 UNIT RUMAH TERES 1 TINGKAT (III) 6 UNIT RUMAH BERKEMBAR 1 TINGKAT BERSERTA 1 UNIT PENCAWANG ELEKTRIK DAN LOJI RAWATAN KUMBAHAN MEKANIKAL, DIATAS LOT 97321, JALAN PAYA BARAT, MUKIM KAPAR, DAERAH KLANG, NEGERI SELANGOR DARUL EHSAN”. | Nov-16 |
| 136 | MACKINTOSH PROBES WORKS FOR “CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN DUA (2) TINGKAT BAGI MENGGANTIKAN BANGUNAN SEDIA ADA UNTUK DIJADIKAN PUSAT KOMUNITI ORANG ASLI DI KM24, JALAN GOMBAK, GOMBAK, SELANGOR.” | Nov-16 |
| 137 | SOIL INVESTIGATION WORKS FOR “CADANGAN PEMBANGUNAN 3 UNIT BANGLO, DIATAS LOT 1567 & 1569, JALAN MERPATI, TAMAN ZOO VIEW, ULU KELANG, SELANGOR DARUL EHSAN. | Nov-16 |
| 138 | SOIL INVESTIGATION WORKS FOR PROPOSED PIPELINE DISTRIBUTION FOR SEMANGAR AND SEDENAK, JOHOR. | Nov-16 |
| 139 | SOIL INVESTIGATION WORKS AT JALAN YAP KWAN SENG, UNION EQUITY, KUALA LUMPUR. | Nov-16 |
| 140 | SUNWAY SOUTH QUAY SDN BHD / SUNWAY SOUTH QUAY / PH2G-RC6-246 UNIT CONDOMINIUM (SUB-SURFACE INVESTIGATION (SI) FOR RC6 & RC7). | Dec-16 |
| 141 | SOIL INVESTIGATION WORKS AT AIR PANAS, SETAPAK, KUALA LUMPUR. | Dec-16 |
| 142 | SOIL INVESTIGATION WORKS AT KLVC, JALAN GURNEY, KUALA LUMPUR | Dec-16 |
| 143 | SOIL INVESTIGATION WORKS AT MATRADE, SEGAMBUT KUALA LUMPUR UNTUK TETUAN TTDI METROPOLIS KL SDN BHD | Dec-16 |
| 144 | SUNWAY SOUTH QUAY SDN BHD / SUNWAY SOUTH QUAY / PH2G-RC6-246 UNIT CONDOMINIUM (SUB-SURFACE INVESTIGATION (SI) FOR RC7). | Dec-16 |
| 145 | SOIL INVESTIGATION WORKS FOR SUNWAY VELOCITY LINK BRIDGE-MRT COCHRANE STATION. | Mar-17 |
| 146 | SOIL INVESTIGATION WORKS AT KUALA KUBU BHARU, SELANGOR DARUL EHSAN. | May-17 |
| 147 | SOIL INVESTIGATION WORKS FOR THE PROPOSED 3.0MG CLEAR WATER TANK AND TREATED WATER PUMPING STATION AT TELUK KEPAYANG WATER TREATMENT PLANT. | May-17 |
| 148 | SOIL INVESTIGATION WORKS FOR “CADANGAN MEMBINA DAN MENYIAPKAN 9 UNIT RUMAH TERES 1 1/2 TINGKAT, 11 UNIT RUMAH TERES 1 TINGKAT, 10 UNIT RUMAH BERKEMBAR 1 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK PADAT, DIATAS PT 14667, MUKIM TELOK PANGLIMA GARANG, DAERAH KUALA LANGAT, NEGERI SELANGOR UNTUK TETUAN ARMADA BAYU SDN BHD”. | May-17 |
| 149 | SETIAWANGSA-PANTAI EXPRESSWAY (SPE)-DUKE PHASE 3 SECTION 4-SETIAWANGSA TO MELATI CONSTRUCTION SUBSURFACE EXPLORATION WORKS FOR INTERCHANGE NO.5 & NO.6, MAINLINE PA-P45 AND P103-P139 (Balance) | Sept-17 |
| 150 | SOIL INVESTIGATION WORKS FOR CONSULTANCY SERVICES FOR DESIGN WORKS FOR THE NEW PARKING EXPANSION IN THE VICINITY OF AIR SELANGOR HEAD QUARTERS AND KUALA LUMPUR REGION. | Nov-17 |
| 151 | SOIL INVESTIGATION WORKS FOR CADANGAN PENYURAIAN TRAFIK DAN KERJA-KERJA MENAIKTARAF JALAN TUN RAZAK DARI JALAN LANGGAK GOLF KE BULATAN KAMPUNG PANDAN KUALA LUMPUR (PACKAGE 2) UNTUK TETUAN TRX CITY SDN BHD. | Jan-18 |
| 152 | KERJA-KERJA PENYIASATAN TANAH & UJIAN MAKMAL BAGI PEMBINAAN JEJANTAS PEJALAN KAKI DAN MOTOSIKAL MELINTASI LANDASAN DI SEKTOR KLANG VALLEY-KUANG, SELANGOR. | Jan-18 |
| 153 | SOIL INVESTIGATION WORKS FOR WORKS FOR REHABILITATION OF TRACK FORMATION, REPLACEMENT OF BALLAST AND ASSOCIATED WORKS BETWEEN JERANTUT, PAHANG TO GUA MUSANG RAILWAY STATION, KELANTAN (PACKAGE B)-ADDITIONAL | Apr-18 |
| 154 | MACKINTOSH PROBES WORKS FOR “CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI SERVIS 39 TINGKAT (473 UNIT) DENGAN 8 TINGKAT PODIUM TEMPAT LETAK KERETA, RUANG PERNIAGAAN, KEMUDAHAN AWAM, DIATAS LOT 76, OFF JALAN KOVIL HILIR, SEKSYEN 76, BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR”. | Apr-18 |
| 155 | SOIL INVESTIGATION WORKS FOR CADANGAN PEMBANGUNAN 1 BLOK PANGSAPURI KOS RENDAH 21 TINGKAT YANG MENGANDUNGI (I) 250 UNIT KEDIAMAN KOS RENDAH SDN BHD (II) 6 TINGKAT PODIUM TEMPAT LETAK KERETA (III) 1 TINGKAT KEMUDAHAN PENDUDUK DI ARAS BAWAH (IV) 1 BUAH KEBUK SAMPAH, DI ATAS LOT PT118 (DULU DIKENALI SEBAHAGIAN LOT 146), SEKSYEN 84, OFF JALAN SENTUL, KUALA LUMPUR UNTUK TETUAN DEWAN BANDARAYA KUALA LUMPUR. | May-18 |
| 156 | SOIL INVESTIGATION WORKS FOR CADANGAN PENYURAIAN TRAFIK DAN KERJA-KERJA MENAIKTARAF JALAN TUN RAZAK DARI JALAN LANGGAK GOLF KE BULATAN KAMPUNG PANDAN KUALA LUMPUR (PACKAGE 2) UNTUK TETUAN TRX CITY SDN BHD. (SECTION B) | June-18 |
| 157 | SETIAWANGSA-PANTAI EXPRESSWAY (SPE)-(DUKE) PHASE 3: SECTION 2-SALAK TO PANDAN (DETAIL SOIL INVESTIGATION WORKS) | June-18 |
| 158 | SETIAWANGSA-PANTAI EXPRESSWAY (SPE)-(DUKE) PHASE 3: SECTION 2-SALAK TO PANDAN (CONSTRUCTION & COMPLETION OF COMPACTION GROUTING WORKS FOR PIER 44 TO PIER 61) (COMPACTION GROUTING WORKS) | Aug-19 |
| 159 | SETIAWANGSA-PANTAI EXPRESSWAY (SPE)-(DUKE) PHASE 3: SECTION 2-SALAK TO PANDAN (ROCK FISSURE AND COMPACTION GROUTING HOLES FOR CURTAIN GROUTING) | Nov-19 |
| 160 | RESTORATION OF TRACK AND SLOPE STABILIZATION, TRACK REHABILIZATION AND ASSOCIATED WORKS DUE TO MAJOR FLOOD BETWEEN GUA MUSANG AND TUMPAT RAILWAY STATION, KELANTAN – Package C | Feb-20 |
| 161 | SOIL INVESTIGATION WORKS FOR CADANGAN PENYURAIAN TRAFIK DAN KERJA-KERJA MENAIKTARAF JALAN TUN RAZAK DARI JALAN LANGGAK GOLF KE BULATAN KAMPUNG PANDAN KUALA LUMPUR (PACKAGE 2) UNTUK TETUAN TRX CITY SDN BHD. (SECTION C) | June-20 |
| 162 | CADANGAN MENDIRIKAN 1 UNIT RUMAH BANGLO 3 TINGKAT DENGAN 1 TINGKAT BASEMENT DI ATAS LOT 7048, JALAN PAKIS 2, TAMAN FERN GROVE, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. | Aug-20 |
| 163 | KERJA-KERJA PENYIASATAN TANAH (SI) BAGI PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI SEKOLAH TUNAS BAKTI SUNGAI BESI, KUALA LUMPUR. | Sep-20 |
| 164 | KERJA-KERJA PENYIASATAN TAPAK DAN PENGUJIAN MAKMAL BAGI PROJEK PEMBINAAN DEWAN BESAR SERTA LAIN-LAIN KEMUDAHAN LENGKAP DI INSTITUT PENDIDIKAN GURU KAMPUS PENDIDIKAN TEKNIK BANDAR ENSTEK, NILAI, NEGERI SEMBILAN. | Jan-21 |
| 165 | KERJA-KERJA PENYIASATAN TANAH (SI) BAGI PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI SEKOLAH KEBANGSAAN SAUJANA IMPIAN 2, KAJANG, SELANGOR. | Mar-21 |
| 166 | KERJA-KERJA PENYIASATAN TANAH (SI) BAGI PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI KOLEJ VOKASIONAL SUNGAI BULOH SHAH ALAM SELANGOR. | Mar-21 |
| 167 | MEMBINA SATU BLOK TAMBAHAN (MAHKAMAH TERBUKA) DI RUANG PARKIR MAHKAMAH KUALA SELANGOR, SELANGOR | Julai-21 |
| 168 | CADANGAN PEMBANGUNAN PUSAT PERUBATAN SWASTA 8 TINGKAT (7 TINGKAT KLINIKAL, 1 TINGKAT NON KLINIKAL) DENGAN 1 TINGKAT BASEMEN DI ATAS SEBAHAGIAN LOT PT 270161, OFF PERSIARAN SUNWAY, SUNWAY CITY IPOH, 31150 IPOH PERAK UNTUK TETUAN GREENWAY SDN BHD (Grouting Works) | Jan-22 |
| 169 | SOIL INVESTIGATION WORKS FOR KUALA LUMPUR NORTHERN DISPERSAL EXPRESSWAY (“KL-NODE”) | Feb-22 |
| 170 | KERJA-KERJA PENYIASATAN TAPAK DAN PENGUJIAN MAKMAL BAGI PEMBINAAN BANGUNAN BAHARU 12 BILIK DARJAH DAN LAIN-LAIN KEMUDAHAN DI SEKOLAH KEBANGSAAN BERTAM HULU (MBA2032), MELAKA. | Apr-22 |
| 171 | KERJA-KERJA PENYIASATAN TANAH BAGI LOKASI KEGAGALAN CERUN DI MUZIUM DIRAJA, KUALA LUMPUR | Aug-22 |
| 172 | PELANTIKAN BERGILIR SECARA PUSINGAN KERJA-KERJA PENYIASATAN TAPAK DAN PENGUJIAN MAKMAL BAGI PROJEK PEMBINAAN BANGUNAN TAMBAHAN DI INSTITUT PENDIDIKAN GURU KAMPUS PENDIDIKAN ISLAM, BANGI, SELANGOR | Jun-23 |
| 173 | KERJA-KERJA PENYIASATAN TAPAK DAN PENGUJIAN MAKMAL BAGI PEMBINAAN BANGUNAN TAMBAHAN BLOK PENTADBIRAN, 10 BILIK TOTURIAL, BILIK-BILIK KHAS DAN KEMUDAHAN-KEMUDAHAN LAIN DI KOLEJ TINGKATAN ENAM SRI ISTANA, KLANG, SELANGOR (BEA0099) | Mac-24 |
| 174 | PELANTIKAN BERGILIR SECARA PUSINGAN KERJA-KERJA PENYIASATAN TANAH DAN UJIAN MAKMAL BAGI PROJEK MENAIK TARAF MASJID ABU UBAIDAH AL-JARRAH, TAMAN SRI RAMPAI, KUALA LUMPUR | Jun-24 |
| 175 | LANTIKAN TERUS SECARA PENGGILIRAN KERJA-KERJA PENYIASATAN TAPAK DAN UJIAN MAKMAL BAGI MEMBINA DAN MENYIAPKAN BANGUNAN KOMPLEKS BARU JABATAN KETUA PENGARAH TANAH DAN GALIAN PERSEKUTUAN (JKPTG) NEGERI PERAK DARUL RIDZUAN | July-24 |
| 176 | RANCANGAN TEBATAN BANJIR SUNGAI JOHOR FASA 1 PAKEJ 1 DI KOTA TINGGI, JOHOR – PEMBAIKAN KOLAM TAKUNGAN BANJIR DAN KERJA-KERJA BERKAITAN | Sept-24 |
| 177 | RANCANGAN TEBATAN BANJIR SUNGAI MUAR FASA 3 PAKEJ 1 DI SEGAMAT, JOHOR – MENAIKTARAF SUNGAI MUAR DIANTARA PERTEMUAN SUNGAI JEMENTAH SEHINGGA PERTEMUAN SUNGAI LABIS SERTA KERJA-KERJA BERKAITAN | Sept-24 |
| 178 | PELANTIKAN BERGILIR SECARA PUSINGAN KERJA-KERJA PENYIASATAN TAPAK DAN PENGUJIAN MAKMAL BAGI PROGRAM MENANGANI ISU SEKOLAH BERKEPADATAN TINGGI (PEMBINAAN BILIK DARJAH IBS) BAGI JKR DAERAH KUALA SELANGOR DAN JKR DAERAH KLANG | April-25 |
| 179 | PELANTIKAN BERGILIR SECARA PUSINGAN KERJA-KERJA PENYIASATAN TAPAK DAN PENGUJIAN MAKMAL BAGI PROGRAM MENANGANI ISU SEKOLAH BERKEPADATAN TINGGI (PEMBINAAN BILIK DARJAH IBS) BAGI JKR DAERAH KUALA SELANGOR DAN JKR DAERAH KLANG | April-25 |
| 180 | KERJA PENYIASATAN TANAH (SI) BAGI PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI SEKOLAH KEBANGSAAN ULU SEMENYIH, HULU LANGAT, SELANGOR | June-2025 |